Back to the park with a little mix of everything.
After setting out some empties the A-Team is seen heading back to wait on the branch for the six racks that #938 has for them. NE-1 is a real mixed freight today. Seen behind the engine are two lo... (more)
NE-1 at Altamont….. SMS Local NE-1 with the A-Team on board (Billy/Jeremy) is seen passing the Village of Altamont’s Historic 1897 D&H Depot as it trundles back to the Northeastern Industrial ... (more)
Heading Back to the Park.
After uncoupling from there mty racks on the Albany NE-1 with GM Brian Murray at the Controls gets ready to set off some more mtys onto the interchange track for CP to pick up.
NS #939 is seen pulling ahead off the Albany Main with NE-1's mty's while fellow railfan and RP contributor John Sesonske waits patiently for #939's power to pull up next to SMS's #2003 so he can ... (more)
First Run on the Albany Main....After picking up there loaded racks from CP. #2003 storms up the hill up out of Delanson with GM Brian Murray at the Controls.
Last Run on the Albany Main....With Chris at the throttle putting #301 through the paces NE-1 climbs up the hill from another Successful interchange with CP and makes its way back to the park with... (more)
Jeremy keeps a close eye ahead as Chris Throws a wave and pulls nine loaded autoracks off CP onto the Albany Main for the trip back to the park. Today’s run marked the second time the #301 ran d... (more)
Only Miles away from its final destination for the day. SMS Line’s NE-1 is seen passing through the Black Creek Marsh Wildlife Management area with another load of Ford products. The distant hil... (more)
Back to the Park with two.
With Bill Giving the #1424 all its got, NE-1 heads back to the park with five loaded racks on my 34th Birthday.