Due to 50mph winds, IAIS's mainline was shut down due to a fence and power lines falling on the main. IAIS 505 pulled right up to the fence which made for perfect pictures!
The afternoon of March 31st has turned rather dreary although it doesn't dampen the spirits of CSX Y104's "cool crew" which is seen after cutting off their transfer cut on the south end of NS's In... (more)
TRT-909 is a Track Renewal Train that can simultaneously replace both rails along with removing and replacing ties. It can install wood, concrete (as seen here), or steel ties while pulling and re... (more)
Working slowly toward Radium, Colorado, on Union Pacific’s Moffat Tunnel Subdivision is TRT-909 on August 6, 2009. TRT-909 is a Track Renewal Train that can simultaneously replace both rails alo... (more)