A westbound stack train flies through Cove.
NS 951 is framed by some trees at the west end of Rockville Bridge.
NS 951 has been re-crewed in Harrisburg and now continues its journey west.
NS 951 is passing CP-88 on the Lehigh Line.
NS 951 passes by the remains of Bethlehem Steel as it slows to enter Allentown Yard.
CP 2317 storms through Moscow on its way to Cresco and ultimately East Stroudsburg.
NS 38T/ CP 258 approaches CP Bethlehem. It will make a set out in the River Yard before parking the power on the Freemansburg Industrial Track.
The setting sun lights up the flanks of 24Z as it approaches Galitzin Tunnel.
A pair of helper sets rest between assignments.
An empty coal train climbs towards the summit at Galitzin.
Helpers shove an eastbound stacktrain through Cassandra.
NS and CP power lay over on the Freemansburg Industrial track.
CP/D&H power lays over on the Freemansburg Industrial Track.
65J sails through the S curve along the Lehigh River at CP 88.
Just minutes after 35A departs, 34M arrives at the west end of Allentown Yard.