Ever wonder what it looks like going 12 mph down poor rail in a GP15? Engineer John takes his train North out of Chippewa Falls all the way up to Rice Lake. After some switching, we headed back do... (more)
This bonder uses a spark gun to light the cap that burns hot enough to bond the signal wire to the side of the rail. He will bond 2 wires across this joint to keep the signals in good operation wi... (more)
A BNSF welder fills in a switch frog with a steady weld just outside of Northtown Yard. Once the weld is laid, he will grind and shape the original contour of the rail. He has many tools at an arm... (more)
The work it takes to clean up an entire yard after a heavy snow is just mind blowing. Every switch gets blown, shoveled, and sweeped out to keep everything in perfect working order.