Deseret Power’s empty train is tiptoeing at 5 mph here over a newly replaced rail under the watchful eyes of a couple of the MOW crew who are behind the train and down the embankment out of sigh... (more)
Deseret Power Railway's morning, loaded, train ran around 4 hours early this morning so as to open a window for the maintenance crew to replace a rail at around MP 1.5. After unloading at the Bona... (more)
Deseret Power’s morning, loaded, train ran around 4 hours early this morning so as to open a window for the maintenance crew to replace a rail at around MP 1.5. The now empty morning train rolle... (more)
Deseret Power’s morning, loaded, train ran around 4 hours early this morning so as to open a window for the maintenance crew to replace a rail at around MP 1.5. The now empty returning morning t... (more)
In the sparsely-populated high desert area of eastern Utah, an eastbound Deseret Power Railway unit train passes milepost 31 a few miles east of the Bonanza Power Plant on a beautiful October 21, ... (more)