The three SD80MAC pushers (7216, 7209 and 7213) on the rear of this loaded coal train catch the last few rays of sunlight as they grind uphill toward the summit at Gallitzin. By the time the three... (more)
A pair of clean SD80MACs lead this loaded coal train into Enola Yard. Later, they will head down the Port Road Branch to deliver PP&L hoppers. This tunnel is actually a flyover of track D over G..... (more)
With the sun quickly setting behind the mountains, two SD80MACs struggle to lift a loaded coal train through Lilly. Another three SD80MACs are shoving on the rear of the train.