NS 349 leans into the curve approaching "King" with UP 5092 leading BN SD60M 9209.
NS 3305 leads 349 long hood forward with the throttle wide open.
349 lugs past the station at High Point at sunset.
Easing through town at Restricted speed 349 is pulling 11 units after cleaning out Raleigh.
349 Derailed Several cars while pulling through Pomona Yard.
NS 349 departs Raleigh with an ex-SP tunnel motor (now GECX) in tow
NS 349 breezes past the newly rebuilt siding at Funston west of Durham, NC.
NS 349 sweeps through the new alignment approaching the interlocking at 'King'
NS 349 rounds the curve in downtown Cary, NC
NS 349 heads west out of Raleigh.