Power for Union Pacific's Aurant Switch waits out the weekend for its next assignment. This is a bad location for tagging, so finding a pristine Baby Tunnel Motor here was a nice surprise.
A pair of units lead the 63R yard job down the San Pedro Sub, passed CP-Riddle and approaching 3 more signals on their trek down to pick up the tied down YLA51's train.
The AM J-Yard switcher shoves out of the J-Yard and along Alameda Street with a couple EMDs shoving. The Alameda Corridor is to the right of the power.