P16-EV120-P14 returning from an infrastructure evaluation run to Mernda at West Richmond.
P16-T395-T356 with an SSR works train near Macleod.
P14-EV120-T386 returning from an infrastructure evaluation run to Carrum approach Caulfield.
P14-EV120-T386 returning from an infrastructure evaluation run to Cranbourne at Oakleigh.
P17 and T386 running in push pull mode pass through Albion Junction with a rail train from the McIntyre Sidings.
P17-T356-T381 with an SSR works train at Ascot Vale.
P17-EV120-T386 returning from an infrastructure evaluation run to Warrnambool approach Newport.
P16-T364-T385 trail an SSR works train from Carrum through Bonbeach.
P16-T364-T385 with an SSR works train between Carrum and Seaford on the Frankston line.
P18-P16-P17-S312 stabled with a broad gauge SSR grain consist at Appleton Dock.
P16-EV120-T385 on an infrastructure evaluation run to Gippsland approaches Westall.
P16-EV120-T385 on an infrastructure evaluation run to Alamein approach Ashburton.
P17 hauling a BGKF grain wagon and a retired Metro Comeng set destined for Bendigo approach Sunshine.
P16-T363-B75-S312 stabled with a broad gauge SSR grain consist.
An SSR works train with P17-T364-T385 on the Frankston line between Carrum and Seaford.