235 makes a left turn and heads westbound out of Spencer.
6312 leads an eastbound past a short stone train at Spencer. A few minutes later and the 4003 would have been in the sun...
EB freight heads down the Brewster line w/ ex-D&RGW unit.
EB freight awaits its turn to enter the Brewster line at the interlocking.
Conductor awaiting the move by the neat high tech electric switch.
Old warhorse, originally SOU switches the interchange w/LLPX6314
A matched trio of Wheeling SD-40s and 129 loads of coal bound for Rayland, OH.
Westbound grain empties for New Washington, OH shoving onto the AC&Y main at Spencer.
51 Stone loads for Seville Sand and Gravel
The 3102 holds the main while units 6382 and 3034 are dropped off at Spencer.
After detatching from the other units, the 3034 and 6382 cross Main St.
The 6382 and 3034 take the connecting track between the Akron and Brewster lines.
Four different paint schemes are visible in this scene at Spencer.