A triclops SD60M leads the MRVSJ out of Niles Canyon on its way to Newark and San Jose. The train is about to pass through a wide load detector that protects tunnel 1 on the Oakland Sub.
On a beautiful fall morning, the roar of GEs echoes through the American River Canyon as the eastbound KLTG2 pushes upgrade at Cape Horn. At this location, track one cuts through the hillside in t... (more)