NS 741 cruises through the snow on icy rails in Sherrills Ford, NC on a cold snowy afternoon.
NS 119 rounds the curve at Concord, NC under a Southern Cantilever that's due for replacement any day.
After spending a few days in Asheville, 744 made a run down the district in perfect morning light with one of two NS "Blue Bonnets" leading.
After reaching Horn Lake, the train backs past the turned heads on the 90's SafeTran signals to get in position for loading the next morning.
134 closes in its journey on the S-Line as it passes the 28 Milepost with the Wabash Heritage and a rather unique CP Rebuild trailing.
NS 68V hauls lime loads down the Catawb Lead towards Plant Marshall under Long Island Rd Bridge.
NS 745 heads west on the NS Marshall Line with exactly 100 "DKPX" Bethgons.