#2 rolls through Marshland after working the BN interchange at East Winona.
#321 was the last unit rebuilt and load tested by the crew at Norwood Shops prior to the WC takeover.
The conductor on train #2 prepares to disembark as the caboose approaches the Wisconsin Rapids yard office.
#318 leads #2 as it begins its eastward trek across Wisconsin on very cold December morning.
#311 leads #2 across the Wisconsin River bridge and into Wisconsin Rapids Yard.
#2 accelerates east through Marshland after working the BN interchange at East Winona.
Three RSD-12s lead a loaded Tilden Job upgrade at Palmer Line Junction.
GBESA waits for its counterpart, ESGBA, at the east of the passing siding at Powers.
#51 awaits to depart Wallace Yard behind GP9 #1765, framed between the hopper doors of a grain hopper.
#122 leads a string of GP9s and an SD45 into Pleasant Valley.
#322 leads train #1 as it departs Black Creek.
#322, 320 and 319 rest between assignments. These three units were part of the five rebuilt "Hornells" purchased by the GB&W in 1980.
#314 brings #2 into Wisconsin Rapids.
Caboose #114 brings up the rear end of an eastbound Boat Train departing Norwood Yard.
#316 works the west leads of Wisconsin Rapids Yard.