For some unknown reason, the wait for this one was a lot longer than usual. But it paid off, as we found out the 290 was led by two SOO SD60's. Standing in a knee-high poison ivy patch wasn't so... (more)
A signal maintainer greets the crew of the 290 as he performs a timing test as part of his FRA mandated annual inspection of the crossing flashers near MP 110. He had contacted the train several ... (more)