Crossing the new bridge, the local heads back to Cecilia and the mainline after switching industries. The line used to connect with L&N in town but no more.
All the GP-10s were eventually lodged in the 8300s and this was the first paint scheme. This one was repainted around 1987 and the paint job has a few years on it at this point.
P&L had given their pimply-faced troll of a RFS the rare day off to go to a meeting of RFSA (Railfan Frustration Specialists of America) and forgot two cardinal rules. 1. Never run a train in day... (more)