A large "Combilift" crane is moving the cab modul of the new "Giruno" train from Stadler Rail for the SBB in Erstfeld. The SBB ordered 29 of this highspeed trains for 250 km/h,... (more)
The newest product of Stadler Rail, the "VSHST" (Very Short High Speed Train) for lines with low passenger demand ;-) No, this is a joke: 2 cab moduls with simulator of the future "... (more)
On my way to work on November 18, 2009, the dispatcher calls to inform me I72 left a track indication between Attica and Marshfield. After obtaining Track Authority, I put my hyrail truck on the ... (more)
A very seldom view, the large hall of Zürich mainstation empty, but this is monday morning at 05.49 AM. About 430 000 people are using Switzerlands most frequented station, with nearly 3000 train... (more)
15 meter long piece of the new Gotthard Base Tunnel (GBT) in original size, exhibited in the Swiss Museum of Transport in Lucerne. All relevant pieces of the bore are demonstrated here.