NS 723 works West to Piney Flats to meet NS 236 before heading on toward Knoxville.
NS 22A copies a track authorithy from the east end dispatcher as they pick up speed westbound after a meet with 38Q at Piney Flats.
These rear end distributed power units work hard to move this loaded ECP brake coal train, NS 770, East toward Roanoke and eventually to Clover, VA.
This CSX empty coal train has nearly slowed to a crawl as it approaches Natural Tunnel on NS trackage.
The 2008 CSX Santa Train gets back up to speed after a stop at Clinchco heading for the next stop at Fremont.
A brand new ES44AC brings coal loads South through Frisco with the NS mainline overhead in the background.
CSXT 4503 takes 89 coal loads into the siding at Boody for a meet with Northbound empties.
2 25N's came into Bristol where they were combined making this train 9,500 feet of empty autoracks
After getting a signal at Jasper, NS 713 gets moving again carrying out a slow order through Harvey.
NS local T74 with 30 coal loads passes through Duffield, VA
NS 79G has just passed under CSX on its way West
The early morning sun starts to peak above the horizon and shine on loaded Duke Power coal train heading South toward Erwin, TN.
NS 16T knocks down the CP signals at Ford to tie the train down for the outbound deadhead crew in transit from Roanoke, VA
NS 73A will be at Watkins for 1 Westbound and 2 Eastbounds before taking its turn to head West
CSX N308 utilizes trackage rights through the Norfolk Southern Yuma Yard with a clear signal at Smith.