The propane train complete with the spreader comes out of the storage track at Marathon. After clearing the points the conductor lines the switch back for the main.
The Herzog MPM pulls out of the old siding (storage track) to head west to the mile 72.3 derailment site from Christmas Eve to continue with cleanup work