Delaware & Hudson U-Boats get ready to depart behind a U33C (757 DH class GRF-33), a Phase 2 U30C (709 DH class GRF-30) and a Phase 1 U30C (701). I believe this was an Allentown to Mechanicville t... (more)
In the fall of 1985 the Belden Hill Tunnel was being rebuilt. During the construction the D&H once again ran under the Starrucca Viaduct. Trains then reversed directions to connect with the x-Erie... (more)