On the evening of the Summer Solstice 2000, a UP Council Bluffs to Salt Lake City director's special snakes through Kyune on the ascent to 7440 ft. Soldier Summit.
Utah Railway MK5000C #5006 leads 4 other engines with a Intermountain Power coal load uphill at Kyune, UT on 10/2/13. 7 helpers engines of different makes and models would be cut in 25 cars from t... (more)
Five of Utah Railway's unique units help lift a Wildcat coal load through the Price River Canyon, with seven more units cut in mid train. The Utah Railway climbing Soldier Summit is one of the bes... (more)
Three MPI MK5000Cs and a single SD40 lead a Utah Railway coal load through the Kyune gooseneck in Price Canyon January 6, 2001. Late in Oct. 2000, the Utah Railway began testing three Motive Power... (more)