U-TAC empties depart Proctor with the DM&IR 215 trailing.
A UP transfer pulls into the CP yard as the 0700 Duluth job shoves into the Port.
Engineers' view of his train as it hangs out of both ends of the track.
Coming off the bridge and into Duluth. The steel structure was built by the American Bridge Company of New York in 1912.
A transfer prepares to head for Duluth.
A UP transfer has brought a single car for interchange to the CP today.
Peddling cars at the elevator.
A birds eye view from the South of the CP Rice's Point yard.
488 waiting to begin its journey at Chama.
BNSF employee special leaves the double track at MP 15.9 as it heads for Draco.
D&SNG 482(right) and tender get some work done inside the roundhouse at Durango.
473 leads the first train of the day out of Durango.
Light power heading south through Price.
SLRG 459 arrives Alamosa from the east after returning from Antonito and going around the wye in Alamosa.
SLRG 18 from ground level.