With the Illinois River well above flood stage, the Peoria & Western trundles across the lift bridge as the crews of towboat Shirley Ann change out on Sunday afternoon Sept 21 2008. The train is r... (more)
Engineer Doug Henry, track warrant and train list in hand, climbs FP9 1750 outside the Kolbe depot at Mapleton, Illinois on Sunday afternoon Sept 21 2008. The train is running a transfer into the ... (more)
Peoria & Western Railway's FP9A's continue to see their second season of service on the former Toledo, Peoria & Western Railway line between Mapleton and Good Hope, Illinois. Engineer Dave Henry i... (more)