The Battenkill railroad begins it's trip north out of Eagle Bridge, NY crossing the Hoosic River as the late December light quickly fades with Alco RS-36 5012 and RS-3 4116 completing the scene on... (more)
Quincy Railroad #5 crosses the valley before climbing the 4% grade to Quincy Junction with four loads from big lumber mill in Quincy, CA. There the crew will set out the loads for the UPRR local a... (more)
The day after winter solstice Quincy Railroad #5 drifts down out of the fog on the 4% grade near Quincy Junction with 9 empties for the big lumber mill in Quincy, CA.
Making a rare Saturday run the Batten Kill Railroad plowed the entire length of their line with a pair light engines to open up after the massive 3 feet of snow deposited on Washington County by W... (more)
BKRR G&J 4116 proceeds south after grabbing lunch at the local deli passing by the park and former Shushan station also feat. the Raven Rail D&H 3021 with the G&J caboose.