EL56-EL62-CLP9 with an SSR grain consist at Appleton Dock.
C501-X31-CLF2 with 9721V container freight from Appleton Dock to Dooen at Manor Loop.
B80-S317 with SSR 9195 empty grain from Appleton Dock to Nullawil at Manor Loop.
B80-S317 with 9195 empty SSR grain train to Northwestern Victoria at Williams Landing.
P16-EV120-P18 returning from an infrastructure evaluation run to Sandringham approach Brighton Beach.
EL62-CLP12-VL354-EL57 with an SSR grain train stabled at Appleton Dock.
GM27-GM10 with the AK cars inspection train heads west through Laverton.
S312-S311 with an empty SSR grain train from Appleton Dock to Tottenham Yard.
S311-B76 with 9196 SSR grain train from Northwestern Victoria at Spotswood.
C506-C507 with 3MC5 empty SSR grain to NSW powers upgrade through Glenroy.
EL56-BRM001-CLP12-VL352 with an SSR grain train at Appleton Dock.
GM10 with a track inspection train cross the Maribyrnong River bridge in Footscray.
P17-EV120-P14 on an infrastructure evaluation run pass through Newmarket.
P17-EV120-P14 returning from an infrastructure evaluation run to Sandringham at Elsternwick.
B80-T386-B75 with an SSR grain #9195 to Nullawil approaching Ballan.