NS train 201 clears the N&W signals at Lewis Run and approaches Lynnwood as the early morning fog burns off in the Shenandoah Valley.
NS 201 with the Interstate Heritage unit leading makes its southbound move through the early morning fog of the Shenandoah Valley. The N&W signal at Lewis Run is also pictured.
NS V84 makes its way to Shenandoah with a 3 motors and a short string of cars.
NS 7693 approaches the signals at Stonewall with Massanutten Mountain in the background.
NS 1097 clears the signals at Stonewall with Massanutten Mountain in the background.
NS 9868 leads train V84 to a stop behind train 201. The siding seen in the foreground is the NS entrance to the Coors brewery in Elkton, VA. Massanutten mountain is seen in the upper left hand cor... (more)
NS 9478 leads two UP's through the signals at Stonewall. Anything but NS has been extremely rare in the past 6 months on this line.
NS 746 finally makes it's way south after an extended stop in Shenandoah. Unfortunately the previous engineer had discarded some of the necessary paperwork.
Engineer Chris Hall makes his way back to Elkton with a short train.
Running LHF NS train V84 heads north in the yard at Shenandoah.
NS train V84 comes north from Waynesboro with cars for Shenandoah, VA.
NS train 201 comes south through Elkton, VA on a warm Saturday morning.
NS 201 blasts off as the morning storm clouds linger over the mountains ridge.
NS 201 comes south out of Shenandoah Yard just after the sun has crested the mountains behind me.
NS 201 races south on a warm spring morning in the Shenandoah Valley.