A westbound Southern Pacific taconite ore train headed for Geneva Steel is working through the curves at Kyune, Utah, while climbing over Soldier Summit on September 8, 1995. Powering the train up... (more)
Three Rio Grande EMD SD40T-2 Tunnel Motors push on a westbound Southern Pacific taconite ore train at Kyune, Utah, climbing the eastern grade of Soldier Summit. Passing the helpers is lone Utah Ra... (more)
Utah Railway empty coal train hits first light at Kyune, 9005 and three sisters will load at Wildcat and bring the loads back west this same afternoon.
Union Pacific’s “dirt train” from Salt Lake City to Helper, the LJP44 local, curves downgrade in Price River Canyon between Kyune and Nolan, Utah, on November 21, 2003.