Testing Brightline continues to run test services in preperation for a launch late in September.
FEC 101 trundles across the Stuart Bridge lead by 814, with 714 behind the LNG GEVO set. This bridge is slated for replacement.
A Brightline test train heads north for some high speed testing further up the line.
A Brightline test train heads south acoss the St. Lucie river as tropical showers blow in from the Atlantic. Start up is due near Sept 22 or so.
Testing testing BLF is testing on the run up to the start of service expected in late September.
The high priority 105 rumbles across the water in Stuart.
336 was the third of three FEC trains in a row to cross the St. Lucie River on this fine spring morning. GP40-2 429 was an unexpected, pleasant surprise on the head end and broke up what would ha... (more)
FEC 101 was the second of three trains to cross the St, Lucie River in relatively quick succession on a fine Florida morning. An extra GEVO was present in the consist. It was not ckear if it was... (more)
434 crosses the St Lucie River in Stuart whilst hauling local 920 back to Fort Pierce from Port Sewall
FEC 912 crossing the river
FEC 206 rolling northbound across the tidewater.
The 101 rolls across the water on a beautiful morning in Stuart
FEC 204 on the Stuart Draw Bridge. There is a proposal to replace this bridge with the new Brightline project
FEC 103 rumbles across the drawbridge in Stuart which is slated to be replaced