162 car eastbound manifest crosses the Thompson River for the second time since leaving Ashcroft.
Coal loads leave Wendover Canyon and pass Wendover Junction along the N. Platte River.
CP stack train with an interesting mix of power. Can't remember the name of the siding near the rear of the train.
CN coal loads head west for export from Roberts Bank
Westbound manifest heads down the Thompson River at Morris.
Tacoma to St Paul MN stack train crosses the Columbia River at Rock Island.
Eastbound intermodal passes the CN bridge over the Thompson River east of Ashcroft.
Manifest with interesting lashup rounds the big curve at Warren
Westbound stack train heads for the Crookton Cutoff
Westbound Z train leaves Green River
Eastbound soda ash pauses for a crew change at the Cheyenne Depot.
BNSF coal loads near the summit of Providence Hill
Westbound manifest rolls down the Thompson between Seddall and Morris.
CP grain train takes the siding for a crew change.
Westbound coal loads near Spences Bridge