After the last passenger train of the day, 90 got called on to take one empty car to the interchange for NS.
Its 1924 and the Great Western's newest locomotive, #90 plows some snow through a small cut. Well, it may not be 1924 or the Great Western. It is 2016 and Strasburgs first day of operation for the... (more)
After sitting all night at the station 425 comes alive as she gets ready to back down to the main for the first run-by of the day.
Working upgrade on the Southern.
Not much needs to be said for this..the J at speed what a sight!
After touring the entire Lehigh and Reading Main Lines of R&N the OCS comes coasting back through Millers Crossing heading back home to Port Clinton.
CP 258 on the R&N Lehighton Branch tied down for a few hours awaiting a new crew.
Northbound (Railroad West) 12T going track speed through the small town of Treichlers. At one time this was the CNJ's Mainline and small station and siding were at this location. Today the siding ... (more)
SRC 89 pulls hard as she brings her 7 car train up the grade out of Cherry Hill
Engineer Jeff Knadler bringing PNEX-31 into Zehners.