Grand Elk train 303 climbs the hill towards Bradley, MI. with a very heavy train doing about 15mph as it approaches the 10th street overpass on a very warm August afternoon at 17:10 hours.
CN Track Geometry Test Rail Car 1501 stops at GTW South Bend Subdivision CP MCKINLEY in Mishawaka, IN. to do some needed repairs on the exhaust system on the rear powered truck.