902 shows all three NBSR paint schemes as backs across Rt. 2 down the Guilford interchange tracks. This location features a road intersection that is crossed by 5 seperate tracks, 3 NBSR and 2 Gu... (more)
NBSR 902 puts together a larger than normal train at the east end of Brownville Jnt on a very cold morning. The temperature at the operation shack was -2F, located behind the green crate.
NBS 902 getting ready to leave Brownville Junction right after a snow storm but the engineer must remove some snow first
Ironroad 902 crossing over from the CP main to the B&A main to get on the KI Sub to head for Millinocket in a snow storm
NBS is putting its train together at the east end of BJct yard. MMA has just arrived with the intermodals which will be added to the NBS train for St. John NB
NB engineering train heads north toward Cincy on an overcast Summer morning.