The LS&I 7 Tilden Job is approaching Empire Junction and heading to the Tilden Mine.
LS&I 1801,1852,1804 have been rolling down a sag and are now starting to tackle the grade that stretches pretty much the rest of the way to Eagle Mills. This job has the normal cut of 60 loads.
LS&I 1804,1802,1850 head toward Eagle Mills with 60 loads from Tilden mine.
The 7 Tilden gets ready for another day of shuttling between the yard and the mine in God's Country.
Lake Superior and Ishpeming 7 Tilden job is passing through Palmer Line Junction as it returns to the Tilden Mine.