A recently rebuilt F40PH pushes the 1:00 train east as a an outbound manifest freight is about to pass through.
Recently shopped F40 embraces the evening sun under the yet-to be installed tri-light signals. See 336934 to see th... (more)
Metra 115 leads its outbound train past CP 8800, the leader of Franklin Park Railroad Daze', 2009 line of equipment.
Heading for the western burbs, the 115 leads her train through the "S" curves at Carpenter St.
Shadows! As the sun goes down, the skyscraper leaves a shadow on the Chicago Sun-Times buidling, a skyscraper off frame to the left casts a shadow on the visible skyscraper, a tree casts i... (more)
A northbound "scoot" heads past the manned interlocking at Roundout.
Two suburban trains glide past each other durring the evening rush.
A Metra F40PH highballs west toward Elgin.
Metra 115 leads Metra 108 into Elgin on the daily double header.
Metra 115 passing under the old Pensey signal.
Northbound at 1:31 PM on May 14, 2003