NS 8910 and two sisters sit idling in snow showers as workers attempt to fix a derailment. Hopper doors came open and spilled the load, then derailed when pulled forward.
With the sun quickly fading behind Turley Mountain, NS 76G works on the first cut of coal hoppers as power awaits the second cut at the National Coal loadout.
In what will be a six to eight hour job, NS 76G prepares to take the first of two cuts to the Turley loadout operated by National Coal. The loadout consists of three frontend loaders scurrying abo... (more)
As the sun creeps behind Turley Mountain to the west, NS 76G prepares to take the first of two cuts of mtys under the loadout. The loadout consists of three frontend loaders and takes six hours fo... (more)
In the dogdays of Summer, NS 76G has just finished loading the second cut of coal and will soon head south on the Jellico Branch to John Sevier Yard in Knoxville. A brakeman stands by, preparing t... (more)
NS 8885 idling away, awaiting a fresh crew to finish loading the second half of the cut at National Coals Turley facility on the Jellico Branch.