An Eastman bound loaded coal train cruises at track speed through the community of Dryden, VA.
The lead engines of a loaded train easily come to a stop while coming into Cadet for a banner test, about a quarter mile away.
NS 9548 leads two other motors and a double stack train across the Ohio river bridge in Kenova.
CSX 842 comes to a slow after topping the grade at Big Cut. When the pushers reach the top of Big Cut, they will cut off and head back to Loyall.
An empty coal train heads up the T.B. Line to St. Charles to load an Eastman Coal train.
NS 9354 has just came through Murphy Junction crossing the French Broad River in Asheville, NC.
CSX 268 has successfully crested the grade at Watkins and is heading through "The Cut".
A Road Railer bound for Somerset, KY trucks along at Parkers Lake.
The 73rd Annual Santa Train hustles down a straight stretch between Dante and St. Paul.
An empty coal train comes upgrade from Esserville toward Dixiana.
CSXT 542 is in notch 8, coming up grade at Peabody.