BNSF 4074 Waits on the siding
BNSF 5213 Glides down grade, while BNSF 5425 waits for it's turn to climb the hill.
Two Dash 9s and a dirty SD40-2.
A Trio of BNSF Dash 9s lead a stack freight down the back side of Bealeville toward Caliente.
4926 climbs around the Tehachapi Loop.
A two mile hike will get you a rare view like this one of the backside of Bealeville Siding as BNSF 4870 brings down a loaded cotton train.