Wisconsin Northern job L1 approaches Stella Jones in Cameron with three pole loads to spot. The McFarland Cascade/Stella Jones facility marks the northern end of the Wisconsin Northern. PGR's pair... (more)
LTS82 is down on its knees as it climbs up the 1.25% grade out of Chippewa Falls with UP 1984-NS 9912-UP 6824-6944-6728 for power. They had 95 sand loads from the WN along with 6 empty scrap gondo... (more)