Reading 2102 reverses into Jim Thorpe with its train now facing towards Reading for the return trip.
Reading 2102 coasts through the small town of Molino as it nears the end of its first leg on the return trip to Reading Outer Station.
Reading 2102 wyes its 18-car passenger train on the newly-built Lehigh River Bridge at Nesquehoning Junction.
Reading 2102 fills the sky with black smoke as it pounds up the grade through Nesquehoning.
Reading 2102 blasts out of Tamaqua Tunnel with the final Iron Horse Ramble of 2022 with a thick plume of black smoke and its exhaust pounding off of the surrounding mountains.
Reading 2102 and Reading & Northern 425 slowing come up to their operating boiler pressures the day before their first doubleheader since 1988. This is also the first time the two locomotives were... (more)
Reading 2102 is slowly brought up to pressure having just had a fire lit in its firebox.
Reading 2102 and Reading & Northern 425 coast downgrade through the iconic field in Molino on a beautiful mid-summer afternoon.
Reading 2102 and Reading & Northern 425 prepare to leave Port Clinton on a beautiful August morning.
Reading 2102 simmers in Port Clinton while a re-enactor poses on the Port Clinton Turntable with a lantern and cigar. NOTE: This shot was obtained with permission of the railroad during a priva... (more)
Reading 2102 and Reading & Northern 425 simmer in the early morning hours of August 13th. This day marked the first time the two locomotives ran together since 1988.
Reading 2102 arrives in Jim Thorpe with its Reading 6 Chime blowing signaling its arrival.
Reading 2102's drivers glisten as the light of the day begins to reach Port Clinton.
Reading 2102 coasts down hill with a large plume of black smoke as it begins its final leg of the trip.
Reading 2102 hustles through Leesport as it nears the last few miles of its second public excursion.