MRL's Laurel to Missoula manifest train, led by MRL 390,392 and a SD45, enter the curve after crossing the Yellowstone River at a location known as Twin Bridges 6/30/05.
As the sun drops down below a deck of clouds minutes before sunset, Amtrak Train #28, the Portland section of the Empire Builder, drops down Providence Hill as the sun glints off of the second P42... (more)
The maiden run ES44C4's head west through Perea,NM with about 5 minutes of sunlight left on 7/16/12. 1 minute before the train showed up, the sun was hiding behind a cloud.