After a brief stop on the CN Stamford Sub after crossing International Bridge, CP train 143 with the CMQ barn pair accelerates down the Belt Line Sub towards Buffalo's Seneca Yard as crosses over ... (more)
After crossing the Buffalo River on the track 3 lift bridge, Canadian Pacific 143 snakes its way from the Compromise Branch on to the lead into the Seneca Yard intermodal facility. On the point of... (more)
This train brought railfans and photographers from all over the country, to converge on CSX Train Q165. This Q165 had 2 CM&Q SD40-2F “Barns”, leading 2 broken CP engines... one being the Air F... (more)