Traction passenger Train of dual-engine HXD3C Electric Locomotive
HXD1C electric locomotive is trunk freight by six axis AC drive electric locomotive, the car Zhuzhou electric locomotive to Chinese railway transportation market Need and the development of the ma... (more)
Guangzhou Railway Station to be upgraded,0Z805 locomotive return to locomotive depot, K511 times passenger train is ready to start.
HXD1D type quasi high speed electric locomotive, traction X112 train through Beijing Guangzhou railway ShaoGuan East Railway Station
K935 passenger train approaching Shaoguan East Station.
Chinese CRH2A EMU Nanning Guangzhou railway EMU last task execution
HXD1C type freight locomotive traction freight trains to avoid a nonstop passenger train from Guangdong train station Shaoguan Huanggang 3 departure track continue to run on the Beijing Guangzhou ... (more)
As Siu lam station is the Guang Zhu spur line station for Xinhui, the west-bound Zhanjiang trains need to be separated at Siu lam station. Not every train bound for west of Zhanjiang will stop at ... (more)
G1124 passenger train at Guangzhou South Railway Station is going to Wuhan in Central China
HXN5B locomotive takes the task of freight train transit
CRH380BL high-speed EMU, produced by CRRC Locomotive and Changchun, is waiting for the signal to be returned to Wuhan EMU
China Southern Locomotive Zhuzhou electric locomotive factory produced HXD1D type passenger electric locomotive, traction electricity supplier straight special cargo X112 (Dongguan Shilong - Beiji... (more)
The E2 subway train stops at Kowloon Tong Station
0D136 return train, stop at the train station
The K301 train passes through the Beijing Guangzhou railway chicken pit Bridge