Conductor is out on deck to visually monitor car spotting.
NS V19 with a rare GP59 begins the long task of building a train. Thanks to my daughter Laurel for assistance on this shot.
With the sun in his eyes, a brakeman directs V19 forward as they build a train in the yard on this blustery morning. The brakeman had to throw the switch for over an hour as the power moved on the... (more)
NS V19 heads West back to the yard office to tie their train down for the afternoon V 40 crew.
Bristol local V19 returns to the yard after making a delivery to Camac Corp.
The crew of NS V19 works across town from the Bristol Yard.
NS V19 completes a cement delivery to Bristol Asphalt on the VSW mainline.
NS V19 works the siding at Royal Mouldings before shoving empties about 2 miles back to the yard
NS V19 shoves back to the yard after having dropped off some hoppers at a local industry
EX BN SD40-2 and an NS GP38AC lead NS V19 by the old Bristol NW train station, which is still in the process of rennovation.
Bristol local V19 makes a reverse move East with permission to pass the stop signal indication back into the yard after dropping a car at a local industry.
Local is shoving cars across town.
Bristol VA local V19 heads back across town to the yard with a string of empties after working the old VSW mainline
Returning to yards following delivery to snack plant.
Freshly refurbished and looking smart