NS 309 rolls through a torrential downpour as it passes beneath an old Erie signal bridge. This particular signal bridge was recently replaced along with many others along this line. Under Conrail... (more)
NS 309 gets back up to speed after stalling as he climbed West out of Attica, only to slow to 10 MPH for a run through the siding to get around some MOW work.