Copper Basin Railway’s OT-1 ore shuttle train prepares to dump its train of copper ore at Asarco’s unloading facility at Hayden, Arizona, on April 20, 2017. The arriving CBRY OT-1 unloads the ... (more)
A machinist from the shop gives Copper Basin Railway EMD GP40 No. 301 and GP39 No. 401 a early morning once over before the power heads out on the Smelter Job on April 21, 2017.
Copper Basin Railway’s Smelter Job arrives back at Hayden, Arizona, on April 21, 2017, and passes CBRY EMD GP39 No. 503. To the left of No. 503 is the railroad’s shop, and on the right is the ... (more)
A view out the cab window and into the mirror of Copper Basin Railway EMD GP39 No. 505 on ore train OT-1 reveals the front part of the train rolling through a curve west of Hayden, Arizona, on Apr... (more)
Two Copper Basin Railway employees work in the repair shop at Hayden, Arizona, on April 20, 2017. The shop is fully-equipped to make repairs to the railroad’s locomotive and freight car fleets, ... (more)