URR 11 and 18 are strung out through the Below yard and onto the Keystone as they slowly pull a cut of CSX cars through the loadout at the coal docks. The silver boxes on the front of the 11 are a... (more)
After a long and slow climb up hill from ET, BMEX 259 starts down grade with its small train of slabs after exiting the 1919 build Dravosburg tunnel. After testing on the URR and also at ET the 25... (more)
BMEX 259 the first of three Gensets to test on the Union railroad leads a train of fresh slabs from the USSX Edgar Thompson Works to the rolling mills of the USSX Irvin Works. Here the train strug... (more)
After trading places a few days before with BMEX 259, RPRX 2010 finally hits the main line performing some tests that will possibly lead to the Union Railroad buy some gensets. Here 2010 leads a t... (more)