Raleigh & Fayetteville's road train heads out of Raleigh after picking up a big cut of interchange traffic off NS at Glenwood Yard.
RF01 departs Raleigh with a big train for Fayetteville.
Raleigh & Fayetteville RF01 works Glenwood Yard behind all three SD40-2s.
A four pack of RJ Corman EMDs lead Raleigh & Fayetteville train RF01 over the NS and CSX mains at Boylan.
RF01 passes through the small town of Linden, NC on their way to Fayetteville.
RF01 works their way down the former NS VF Line with a short train for points south.
RF01 departs Fuquay-Varina for Fayetteville behind a pair of SD40-2 variants including a Tunnel Motor.
An ex-L&N/SP GP38-2 leads RF01 down Hillsboro Street with 25 cars for the Aberdeen & Rockfish in Fayetteville.
Raleigh & Fayetteville's daylight crew switches cars in Varina Yard after bringing in a train from Raleigh.
RF01 crests the final grade on their trip back to Fuquay-Varina.
An SD40T-2 is set to lead the next Raleigh to Fayetteville local on the R&F as it poses next to a Carolina Coastal GP9. NS's single GE for their two Raleigh based locals is also seen i the backgro... (more)
RF01 picks up a hopper at Varina Yard while prepping RF02's train for Fayetteville.
A pair of SD40s lead the Raleigh & Fayetteville road train upgrade at Willow Spring.
RF01 departs Raleigh with a big train of inbounds off NS.
RF01 departs Raleigh with a Tunnel Motor leading for Fuquay-Varina.