After waiting for the morning Amtrak parade, NS 350 throttles upgrade through Cary.
NS 350 grinds upgrade to Fetner with a trio of BNSF SD70ACes.
NS 350 passes Cary after completing the climb to the top of the hill with a trio of SD70ACes.
350 doubles over at CP-Sullivan with BNSF power.