Although the transport of iron ore is the Sishen - Saldanha line's main function, other traffic is also carried. Here, locos 43 088 and 43 070 hammer through Loop 1 at line speed with a string of ... (more)
At the end of a 861 km journey, 15 035 and 43 092 bring their 324 wagon train into Salkor. Another 4 locomotives are cut into the train at various places to assist and are controlled on a RDP (Rad... (more)