Intercity 871 from ZĂ¼rich to Lugano is running 7 minutes ahead of schedule with 200 km/h over the Gotthard Base Tunnel line bypass of Biasca. Leading is cab car Bt, pushing in the rear locomotive... (more)
Push pull train with leading cab car (driving trailer) Bt and Re 460 # 008 in the rear, running with 200 km/h over the Gotthard Base Tunnel bypass of Biasca. Intercity 871 from ZĂ¼rich to Lugano. ... (more)
On the new Gotthard Base Tunnel line, there are 3 different types of passenger rolling stock circulating in the moment. The ICN RABDe 500 tilting trains, the highspeed tilting trains ETR 610 of SB... (more)