On Easter Monday, the return traffic from Ticino northbound is always very heavy, the trains are reinforced to maximum capacity and additional relief trains run. This is the Eurocity 320 from Mila... (more)
Alstom built highspeed tilting train RABe 503 # 012 "Ticino", coupled with ETR 610 # 010 of the SBB, is leaving the 57 kilometer long Gotthard Base Tunnel at Rynächt near Erstfeld at 160 km/h, ru... (more)